Office relocation & network rebuild
Moving offices is stressful enough without the IT going wrong. We handled the full network rebuild at the new location, reinstalled all hardware, and had the team back up and running on day one — no lost productivity.
The company was relocating to a new office and needed the IT moved and rebuilt with minimal disruption to operations. The new space had no existing network infrastructure. Everything — cabling, switches, Wi-Fi, servers, workstations — needed to be planned and installed from scratch around a tight moving schedule.
We surveyed the new office before the move, designed the network layout, and co-ordinated with the fit-out team on cabling. On moving day, our engineers were on-site to oversee the hardware move, install and configure all networking equipment, reconnect and test every workstation, and verify that all systems and connectivity were working before staff arrived.
The team arrived at the new office to find everything working. Email, internet, shared drives, printers — all operational from the first day. There was no period of reduced productivity and no IT-related stress during what was already a complex move.
We'd love to hear about it. No hard sell — just a conversation about what you need and whether we're the right fit.